Disposed Petitions / Appeals ( Surface Water )

Sr. No. Case No. Year Petitioner Subject in Brief Order
1 1 2008 PRAYAS, Pune Seeking directions upon Maharashtra Krishna Valley Development Corporation regarding Expression of Interest for Completion of Nira-Deoghar Irrigation Project on Build, Operate, Transfer (BOT) basis. Download
2 2 2008 Chief Engineer, Maharashtra Airport Development Company Ltd. (MADC), Mumbai Dispute between Chief Engineer, Water Resources Department, Nagpur and Maharashtra Airport Development Company Ltd. (MADC), Mumbai regarding water tariff for supply of water to MADC from Wadgaon dam. Download
3 3 2010 Prof. N. D. Patil, Adv. Surekha Dalvi and PRAYAS, Pune Regarding changes in the Distribution Plan of Water from Hetavne Medium Irrigation Project, District Raigad Download
4 4 2011 Bharatiya Kisan Sangh & others Appeal against the order of the Primary Dispute Resolution Officer on dispute relating to issuance or delivery of Entitlement to Water User Associations from Pavana dam Download
5 5 2011 Indiabulls Realtech Limited, Mumbai Seeking waiver of tariff on Recycled Sewage Water allocated to Indiabulls Realtech Limited for their thermal power project at Sinnar, Nashik. Download
6 6 2011 Prof. N. D. Patil, Adv. Surekha Dalvi and PRAYAS, Pune Review of Tariff Orders dated 30/5/2011 & 29/6/2011 Download
7 1 2013 Mohol Taluka Bahu-Udeshiya Shetkari Sangh, District Solapur Regarding PIL No. 60 of 2013 filed by Mohol Taluka Bahu-Udeshiya Shetkari Sangh, District Solapur in the Hon’ble High Court of Judicature of Bombay for releasing of water into Ujjani Dam from upstream dams. Download
8 2 2013 Shri. B. K. Pacharne, Shri. R. D. Pawar, Shri. S. N. Nagvade & Others Regarding direction sought to release 1.74 TMC water from Kukadi Project and upstream K. T. weirs to the Ghod Project & representation under the provisions of MWRRA Act, 2005 for enabling the required quantity of water to be stored in Ghod storage. Download
9 3 2013 Shri. Panjabrao Bhagat and Shri. R. D. Gargade A) In the matter of PIL No. 95 of 2013, filed by Shri Panjabrao Bhagat & Anr., in the matter of releasing water from Veer, Bhatghar, Devaghar and Gunjawane dams and filling up all K T Weirs on Nira river every year Download
10 4 2013 Shri. Shaligram Patil & others Objection against the decision given by the District Collector Buldhana as per the order of the Hon’ble High Court of Mumbai, Nagpur bench in WP No. 2710/2013 filed by the Petitioners Shri Shaligram Patil & others. Download
11 1 2014 Shri Prashant Bansilal Bumb & others. Supply of water to Jayakwadi Reservoir from upstream reservoirs towards equitable distribution of water in the Godavari Basin Download
The Release of Water into the Jayakwadi Reservoir from Upstream Reservoirs for the Equitable Distribution of Water in the Godavari sub-basin Download
Clarifications – In the matter of Order dated 19-9-2014 in Case No. 1 of 2014 and in the matter of Supply of Water to Jayakwadi Reservoir from Upstream Reservoirs towards Equitable Distribution of Water in the Godavari sub-basin Download
State Government’s direction under Section 23 of the MWRRA Act, 2005 in the matter of MWRRA’s Order dated September 19, 2014 Download
12 2 2014 Shri Ghatule, Social Worker, Yelmar and Shri Kate, Chinke. Making available the unutilized water from the Nira Deoghar and Gunjwani reservoirs to benefit the weirs on Man river and the Chincholi Tank in Sangola Taluka Download
13 3 2014 Shri Gorakh Anand Ghadge, R/o Shivane Tal.Sangola, Dist. Solapur Allocation of 5.5 TMC Water from Tembhu Lift Irrigation Scheme for Sangola Taluka Download
14 4 2014 Dr. Dilip Yelgaonkar Distribution /allocation of water from Tembhu Lift Irrigation Scheme for Khatav, Man and Koregaon Talukas Download
15 1 2015 Shri Prashant Bansilal Bumb (MLA) Supply of Water to Jayakwadi Reservoir from upstream Reservoirs for achieving Equitable Distribution of Water in the Godavari Basin (2014-15) as per Hon’ble Bombay High Court Order dated 02/02/2015 Download
16 2 2015 Shri. Suresh Ramdas Dethe (1)(a) In the matter of not releasing water for the second rotation to branch No. 2, ch. No 8/550 in Pandharpur Taluka from NRBC in 2014-2015 & not implementing the sections 12(6) & 12(6) (a) & (b) of the MWRRA Act 2005. Download
Shri. Shahaji Agatrao Nalavade, through Advocate S. M. Bhinge
(1) (b) In the matter of releasing water from NRBC to the Phaltan, Malshiras, Pandharpur and Sangola Talukas
Shri. Balasaheb Jivaba Kargal & Shri. Tukaram Shankar Jadhav.
(2) In the matter of releasing water from Neera Left Bank Canal (NLBC) into Shetphal Tank
17 5 2015 Shri. Bharat Tukaram Bhalke, MLA Releasing Water for Drinking Purpose to the Farmers and the Livestock from the Left and Right Bank Canals of Ujjani Reservoir
18 6 2015 Shri. Siddeshwar Dadasaheb Varade Releasing Water for Equitable Distribution in the Bhima sub-basin upto the Ujjani Reservoir filed by the Petitioner Shri. Bharat Tukaram Bhalke and Shri. Siddeshwar Dadasaheb Varade
19 7 2015 Shri. Rajendra Shivaji Rao Nagawade, At Post Wangdari, Taluka Shrigonda, District – Ahmednagar & Shri. Shrinivas Baburao Ghadge, At Post Inamgaon, Taluka Shirur, District – Pune Releasing Water for Equitable Distribution in the Bhima sub-basin upto the Ujjani Reservoir filed by the Petitioner Shri. Bharat Tukaram Bhalke and Shri. Siddeshwar Dadasaheb Varade Download
20 8 2015 Shri Unmesh Patil, MLA Releasing water from upstream dams in Girna sub-basin into Girna Reservoir Download
21 9 2015 Shri. Bhaskarrao N Kharde, Ex-Chairman, Padamshree Dr. Vitthalrao Vikhe Patil Sahakari Sakhar Karkhana Limited & Others Regarding GMIDC, Aurangabad Order dated 17/10/2015 about releasing water from upstream reservoirs into Jayakwadi Reservoir Download
22 10 2015 Adv. Shivaji Maruti Anbhule Releasing Water from Kukadi Project into Sina Dam Download
23 11 2015 Shri. Ganpatrao Sahebrao Kakade Releasing Water from Kukadi Project into Visapur Project Download
24 12 2015 Shri. Suresh Namdev Gore & Others Review of MWRRA’s order dated 26/10/2015 regarding releasing water from upstream dams of the Ujjani reservoir into Ujjani reservoir Download
25 13 2015 Executive Director, Maharashtra Krishna Valley Development Corporation, Pune Review of MWRRA’s Order dated 27/10/2015 regarding releasing water from Kukadi Complex into Ghod Dam Download
26 14 2015 Adv. Mahadev Choudhary, Mumbai. Case No. 14 of 2015 dated 26 November 2015 – before MWRRA in the matter of Releasing Water into Ujjani Reservoir from upstream dams as per MWRRA’s Order dated 26/10/2015 Download
27 15 2015 Shri. Nandkumar Dagdu Mane (Patil) and others. Water allocation of Dhom and Dhom-Balkavadi Project as per the Approved Detailed Project Report Download
28 16 2015 Shri. Bharat Tukaram Bhalke, MLA, Pandharpur & Shri. Siddeshwar Dadasaheb Varade through Adv. Mahadev Choudhary Releasing Water from upstream dams in the Upper Bhima sub-basin into Ujjani Reservoir as per Hon. High Court’s Bombay’s Order dated 03/12/2015 in WP 11426 /2015 & others Download
29 1 2016 Shri. Keshavrao Ingole Patil, through Adv. Radhakrishna Ingole Patil, Nanded. Releasing Water from Khadakpurna reservoir into Yeldari – Siddheshwar (Purna Project) reservoir as a part of equitable distribution Download
30 2 2016 Shri. Rajendra Shivaji Rao Nagawade, Ahmednagar & Shri. Shrinivas Baburao Ghadge, Pune. Releasing water from Kukadi Complex into the Ghod dam and carrying out equitable distribution for the Ghod sub-basin and deciding water quota for Ghod Download
31 3 2016 Bhartiya Kisan Sangh and others (Dist. Pune) Releasing water from Pavana reservoir on the basis of direction of the Bombay High Court in its Order dated February 12, 2016 in WP No. 1863 of 2013 Download
32 4 2016 Shri. Nandkumar Dagdu Mane (Patil), Chairman, Shri. Chandragiri Kalva Pani Vapar Sahakari Seva Sanstha Ltd., Rahimatpur, Dist: Satara & others through Adv. Suresh Ramchandra Palande. Water Allocation between Dhom and Dhom-Balkawadi Projects as per the approved Detailed Project Report Download
33 7 2016 Shri S. R. Dethe, Dhondewadi and Shri J. D. Shinde, Bhalavani To issue the Orders to Chief Executive Engineer, Executive Engineer, Superitending Engineer for distributing water in Kharif, Rabi, Hot Weather season from tail to head under Section 12(7) of the MWRRA Act Download
34 8 2016 Ratan India Nashik Power Limited Fixation of tariff for treated sewage water allocated to Rattan India Company for TPP, Sinnar Download
35 2 2017 Mr. Pradeep G. Kale & others Taluka Indapur, District Pune, through Adv. Abhijit Deshmukh & Adv. P. H. Gaikwad (Patil). Releasing water in the Bhima River from the Ujjani Reservoir Download
36 5 2017 Trimurty Cooperative Water Supply Systems Ltd, Wanjale, Dist. Pune represented by Shri D. S. Dharpale and 13 Others Proposal of Changing Planned Canal System of Gunjavani Project by Closed Pipeline System Download
37 6 2017 Arvind Gulabrao Sondkar, Didghar, Tal-Bhor, Dist-Pune and 5 Others A fixed quota of water for the K.T. weirs, drinking water schemes, LIS schemes which are already in existence along the Gunjavani river be provided in the project report and others Download
38 8 2017 Adv. Ashish Jaiswal, Ramtek Making Provision of Water for Irrigation Purpose by Curtailing the Use of Water from Pench Project Complex by the Nagpur Municipal Corporation
39 9 2017 Shri N. R. Kakade, Tandulwadi and Shri B. K. Shinde, Madoli Shendechinch Petition against the Order of PDRO regarding equitable distribution of water to the farmers of Bhalavani Branch No. 2 of Nira Right Bank Canal Download
40 1 2018 Chief Engineer (O&M), Nashik Thermal Power Station, MAHAGENCO, Eklahare, Nashik Road Fixation of tariff for contaminated water supplied to MAHAGENCO for Nashik Thermal Power Plant, Eklahare Download
41 3 2018 Adv. Shivaji Anabhule & 2 others through Adv. Kailash Shevale Releasing 1.2 TMC water from Kukadi Command into Sina Dam Download
42 7 2018 Grampanchayat Pimpri Nirmal,Taluka Rahata, District Ahmednagar through Shri. Dnyandev Ghorpade Grievance of the water reservation from Nilwande Dam to the Kopargaon Nagarpalika in the domestic water supply scheme for Shirdi Devsthan Download
43 13 2018 Suo-Moto Petition Relaxing water use norms by reserving water with 135 lpcd norm from Nilwande project to combined water supply scheme of Shri Saibaba Sansthan Vishwastha Vyavstha Shirdi, Shirdi Nagarpanchayat & Kopargaon City Download
44 10 2018 Ashti- Jalashay Shethi- Pani Niyojan Samiti (Prop.) In the matter of Appeal against the Order of PDRO dated 06/04/2018 about regular release of water from Ujjani Project to Ashti Dam Download
45 14 2018 Pune Municipal Corporation Appeal filed by Pune Municipal Corporation in the matter of the Judgment and Order of the Primary Dispute Resolution Officer dt. 23/10/2017 Download
46 11 2018 Grampanchayat Kanadgaon,Taluka Rahuri, District Ahmednagar through Shri. Ravindra Kashinath Gagare In the matter of grievance of the water reservation from Nilwande Dam to the Kopargaon Nagarpalika Download
47 6 2018 Shri. Nandkumar Dagdu Mane (Patil), Chairman, Chandragiri Kalwa Pani Wapar Sahakari Seva Sanstha Ltd., Rahimatpur (Satara) & two others Appeal against the Order of the PDRO dated May 25, 2018 as regards Water Allocation between Dhom & Dhom-Balkawadi Projects as per DPR Download
48 4 2019 Dr. Sanjay Lakhe Patil, President Karmaveer Pratishthan, Jalna Petition filed against the letter Order dated 01/11/2018 of Superintending Engineer & Administration, CADA, Nashik about not releasing water in Jayakwadi dam at Paithan from Upper Dam viz. Gangapur & Palkhed. Download
49 5 2019 Shri. Shankar A. Nagre & Shri. S. U. Naik through Adv. Yashodeep Deshmukh Petition filed by Shri. Shankar A. Nagre & Shri. S. U. Naik through Adv. Yashodeep Deshmukh in the matter of procedure of calculating district wise backlog in Irrigation Sector arising out of the Directives of the Hon’ble Governor Download
50 4 2019 Suo – moto action on the representation preferred by the Petitioner – Govind Baba Water Users association, Nimbi Tal. Manglurpir Dist. Washim Petition filed to release water through canal of Motsawanga Minor Irrigation Project, Motsawanga Taluka Manglurpir District Washim for rabbi season 2018-19 Download
51 12 & 15 2018 Gram Panchayat Pimpri Nirmal, Tq. Rahata, Dist. Ahmednagar through Ex- Sarpanch, Shri. Gnyandev Nana Ghorpade and Miyasaheb Pani Vapar Sanstha Takalimiya through Shri. Gnyandev Nimse, Chairman Petition arising out of Marathwada Water Grid Pipeline Scheme Download
52 3 2018 1) Adv. Shivaji Maruti Anabhule, R/o Ghumari, Tal. Karjat, Dist. Ahmednagar 2) Adv. Kailas Shankararao Shevale, R/o Pategaon Tal. Karjat, Dist. Ahmednagar 3) Shri. Milind Dattatray Bagal, R/o Takali Khandeshwari, Tal. Karjat, Dist. Ahmednagar In the matter of releasing 1.2 TMC water from Kukdi Command into Sina Dam Download
53 6 2019 1. Shri. Balasaheb Damodar Murkhute, Member Vidhan Sabha Nevasa. 2. Nanasaheb Machindra Karade. 3. Dadasaheb Chandrabhan Wagh 4. Pratap Kundalik Chinge. 5. Mula Dharan Pani Wapar Sanstha Chairman, Vice Chairman, Director and members In the matter of getting information about Jayakwadi dam’s water level Download
54 16 2018 Cdr. Milind More (Retd.) Administrative Officer Sahyadri School Seeking approval of water consumption at the rate of 135 liters per person per day at Sahyadri School Download
55 6 2018 Appeal by Shri. Nandkumar Dagdu Mane (Patil), Chairman, Chandragiri Kalwa Pani Vapar Sahakari Seva Sanstha Ltd., Rahimatpur (Satara) & two others (Issued in Compliance Proceeding & Review Applications arising out of Order No. 03/2019) In the matter of Water Allocation between Dhom & Dhom-Balkavadi Projects as per DPR Download
56 11 2019 A Petition filed by Maharashtra State Power Generation Company Ltd. Nashik Thermal Power Station, Eklahare In the matter arising out of Fixation of Tariff for supply of contaminated water for the applicant company for its Nashik Thermal Power Plant at Eklahare and claim of parity as per the rationale based on the Order this Authority in Case No. 12 of 2017 passed on October 13, 2017 Download
57 9 2019 Khed Economic Infrastructure Private Ltd. An Appeal filed by Khed Economic Infrastructure Private Limited (KEIPL) arising out of the order of PDRO dated April 25, 2019 regarding not granting permission to lift 18 MCM water directly from Chaskaman Reservoir instead of downstream of Chaskaman Dam Download
58 7 2017 Shri Subhash Bhagavantrao Ghotkar R/o Morshi, Taluka, Morshi, Dist. Amravati In the matter arising out of denial of permission to dig wells in the notified area Download
59 4 2019 Motsawnga M.I.Tank, Motsawnga Tal.Mangrulpir Dist. Washim In the matter of suo motu action representation Govind Baba Water Users association Download
60 2 2019 Bhagwan Ganpatrao Tidke, R/o. Degaon, Tq. Ardhapur, Dst. Nanded.  & 4 others In the matter WRD’s Impugned Order dated 18/05/2018 about replanning of water allocation of Upper Painganga Project and not taking new project in Upper Painganga Project’s Catchmen Download
61 13 2019 Ardhapur Municipal Council, Ardhapur, Dist- Nanded, Through Mr. Mirza Akhtarulla Baig & others In the matter WRD’s Impugned Order dated 18/05/2018 about replanning of water allocation of Upper Painganga Project and not taking new project in Upper Painganga Project’s Catchmen Download
62 21 2018 Prakash Motirao Wasmate. & 6 others In the matter WRD’s Impugned Order dated 18/05/2018 about replanning of water allocation of Upper Painganga Project and not taking new project in Upper Painganga Project’s Catchment Download
63 1 2019 1. Shri. Madhav Ramrao Kadam R/o. Mudkhed, Tal. Mudkhed District Nanded 2.  Mirza Akhararulla Beg Sadulla Beg R/o. Ardhapur Tal. Ardhapur District Nanded In the matter WRD’s Impugned Order dated 18/05/2018 about replanning of water allocation of Upper Painganga Project and not taking new project in Upper Painganga Project’s Catchment Download
64 3 2021 Gurudev Siddha Peeth, Ganeshpuri, Taluka Bhiwandi, District Thane In the matter of re-categorizing and levying water charges applicable to township to a public charitable trust located in village Ganeshpuri. Download
65 4 2020 Chief Engineer, Maharashtra State Power Generation Company Ltd. Nashik Thermal Power Station Eklahare, District- Nashik A Petition filed by Chief Engineer, Nashik Thermal Power Station [NTPS] (MSPGCL) – Eklahare in the matter of review & removing difficulties arising out of Hon’ble Authority’s Order No. 03/2020 in Case No. 11 of 2019 Download
66 10 2019 Dattakrupa Water Users Association, Nirnimgaon and others Appeal filed against the SE, PIC, Pune’s Letter dated 26/06/2019 pursuant to the PDRO’s Order dated 18/06/2018 Download
67 1 2021 Chief Engineer, Maharashtra State Power Generation Company ltd. Bhusawal Thermal Power Station Deepnagar, Dist- Jalgaon In the matter of resolving disputes with WRD related to penal rates, water metering charges and delay charges. Download
68 5 2020 Municipal Corporation of Greater Mumbai through its Dy. Hydrolic Engineer, Worli, Mumbai In the matter of MWRRA Order No. 01/2018 dated 11/01/2018 whereby Bulk Water Rates for the Domestic Industrial & Agricultural Irrigation Use in the Maharashtra were revised & in the matter of Order dated 16/08/2018 passed by Executive Engineer, Bhatsa Dam Division, Bhatsanagar levying water charges at 2 times of the normal rate to the Petitioner w.e.f. March 2018. Download
69 4 2021 Pioneer Distilleries Limited, Balapur, Taluka Dharmabad, District Nanded In the matter of Appeal under section 22(3) of the MWRRA Act 2005, being aggrieved by the PDRO’s Order dated 27/04/2021 Download
70 14 2018 Pune Municipal Corporation, Shivajinagar, Pune In the matter of the Judgment and Order of the Primary Dispute Resolution Officer dt. 23/10/2017 Download
71 12 2019 M/s Pernod Ricard India Pvt. Ltd In the matter of revision of the water bill as per bifurcation of process water and as raw material. Download
72 22 2018 Hindustan Coca-Cola Beverages Pvt. Ltd, Village Pirangut, Taluka Mulshi, District Pune In the matter of impugned Order of Superintending Engineer, Pune Irrigation Circle, Pune dated 29/09/2018 Download
73 17 2019 Rajendra Ghumare & 2 others In the matter of Marathwada Water Grid sought to be established by State Government contrary to MWRRA Act Download
74 01 2022 Shelke Beverages Pvt.  Ltd. Kondhapuri, Taluka Shirur, District Pune In The Matter of challenging the Primary Dispute Resolution Officer’s dated 25/03/2022 regarding levying water charges to water drawn from private well. Download
75 02 2020 Dilip Vithal Kasar, R/o Village Nimaj, Taluka Sangamner, District Ahmednagar and others In The Matter of Permission dated 26/11/2018 & Corrigendum dated 07/02/2019 by Godavari Marathwada Irrigation Development Corporation, Aurangabad and in the matter of fraud played by the Shirdi Sansthan, Shirdi Nagarpanchayat & Kopargaon Municipal Council Download
76 05 2021 Siddheshwar Pani Vapar Sanstha through Shri. Maruti Sahebrao Bhapkar, Pimpalgaon Pisa, Taluka Shrigonda, District Ahmednagar In The Matter of equitable distribution of water in the command of Kukadi Project as per Section 12(6) & 12(7) of MWRRA Act. Download
77 23 2028 Late Rajabhau Tugar Sahakari Upsa Jalsinchin Sanstha Maryadit Shinde, Nashik through its Chairman Shri. Sanjay Pundalik Tugar In the matter to stay the effect, operation and implementation of the order dated 23/10/2018 issued by the Godavari Marathwada Irrigation Development Corporation Download
78 3 2022 Shri Arun Santoshrao Andhare Challenging the Order of Sub Divisional Officer, Morshi, District Amravati dated 28/04/2021 regarding stopping the drilling of well and closing the excavated pit cum well Download
79 15 2019 Rajendra Bhagwatrao Ghumare, and others In the matter to review of this Authority’s Order dated 19/09/2014 and quash & set aside Government Resolution dated 12/09/2018 Download
80 16 2019 Harishchandra Sahakari Pani Purwatha Sansthache Sahakari Fedration & Other In the matter to review of this Authority’s Order dated 19/09/2014 and quash & set aside Government Resolution dated 12/09/2018 Download