Disposed Petitions / Appeals ( Surface Water )
Sr. No. | Case No. | Year | Petitioner | Subject in Brief | Order |
---|---|---|---|---|---|
1 | 1 | 2008 | PRAYAS, Pune | Seeking directions upon Maharashtra Krishna Valley Development Corporation regarding Expression of Interest for Completion of Nira-Deoghar Irrigation Project on Build, Operate, Transfer (BOT) basis. | Download |
2 | 2 | 2008 | Chief Engineer, Maharashtra Airport Development Company Ltd. (MADC), Mumbai | Dispute between Chief Engineer, Water Resources Department, Nagpur and Maharashtra Airport Development Company Ltd. (MADC), Mumbai regarding water tariff for supply of water to MADC from Wadgaon dam. | Download |
3 | 3 | 2010 | Prof. N. D. Patil, Adv. Surekha Dalvi and PRAYAS, Pune | Regarding changes in the Distribution Plan of Water from Hetavne Medium Irrigation Project, District Raigad | Download |
4 | 4 | 2011 | Bharatiya Kisan Sangh & others | Appeal against the order of the Primary Dispute Resolution Officer on dispute relating to issuance or delivery of Entitlement to Water User Associations from Pavana dam | Download |
5 | 5 | 2011 | Indiabulls Realtech Limited, Mumbai | Seeking waiver of tariff on Recycled Sewage Water allocated to Indiabulls Realtech Limited for their thermal power project at Sinnar, Nashik. | Download |
6 | 6 | 2011 | Prof. N. D. Patil, Adv. Surekha Dalvi and PRAYAS, Pune | Review of Tariff Orders dated 30/5/2011 & 29/6/2011 | Download |
7 | 1 | 2013 | Mohol Taluka Bahu-Udeshiya Shetkari Sangh, District Solapur | Regarding PIL No. 60 of 2013 filed by Mohol Taluka Bahu-Udeshiya Shetkari Sangh, District Solapur in the Hon’ble High Court of Judicature of Bombay for releasing of water into Ujjani Dam from upstream dams. | Download |
8 | 2 | 2013 | Shri. B. K. Pacharne, Shri. R. D. Pawar, Shri. S. N. Nagvade & Others | Regarding direction sought to release 1.74 TMC water from Kukadi Project and upstream K. T. weirs to the Ghod Project & representation under the provisions of MWRRA Act, 2005 for enabling the required quantity of water to be stored in Ghod storage. | Download |
9 | 3 | 2013 | Shri. Panjabrao Bhagat and Shri. R. D. Gargade | A) In the matter of PIL No. 95 of 2013, filed by Shri Panjabrao Bhagat & Anr., in the matter of releasing water from Veer, Bhatghar, Devaghar and Gunjawane dams and filling up all K T Weirs on Nira river every year | Download |
10 | 4 | 2013 | Shri. Shaligram Patil & others | Objection against the decision given by the District Collector Buldhana as per the order of the Hon’ble High Court of Mumbai, Nagpur bench in WP No. 2710/2013 filed by the Petitioners Shri Shaligram Patil & others. | Download |
11 | 1 | 2014 | Shri Prashant Bansilal Bumb & others. | Supply of water to Jayakwadi Reservoir from upstream reservoirs towards equitable distribution of water in the Godavari Basin | Download |
The Release of Water into the Jayakwadi Reservoir from Upstream Reservoirs for the Equitable Distribution of Water in the Godavari sub-basin | Download | ||||
Clarifications – In the matter of Order dated 19-9-2014 in Case No. 1 of 2014 and in the matter of Supply of Water to Jayakwadi Reservoir from Upstream Reservoirs towards Equitable Distribution of Water in the Godavari sub-basin | Download | ||||
State Government’s direction under Section 23 of the MWRRA Act, 2005 in the matter of MWRRA’s Order dated September 19, 2014 | Download | ||||
12 | 2 | 2014 | Shri Ghatule, Social Worker, Yelmar and Shri Kate, Chinke. | Making available the unutilized water from the Nira Deoghar and Gunjwani reservoirs to benefit the weirs on Man river and the Chincholi Tank in Sangola Taluka | Download |
13 | 3 | 2014 | Shri Gorakh Anand Ghadge, R/o Shivane Tal.Sangola, Dist. Solapur | Allocation of 5.5 TMC Water from Tembhu Lift Irrigation Scheme for Sangola Taluka | Download |
14 | 4 | 2014 | Dr. Dilip Yelgaonkar | Distribution /allocation of water from Tembhu Lift Irrigation Scheme for Khatav, Man and Koregaon Talukas | Download |
15 | 1 | 2015 | Shri Prashant Bansilal Bumb (MLA) | Supply of Water to Jayakwadi Reservoir from upstream Reservoirs for achieving Equitable Distribution of Water in the Godavari Basin (2014-15) as per Hon’ble Bombay High Court Order dated 02/02/2015 | Download |
16 | 2 | 2015 | Shri. Suresh Ramdas Dethe | (1)(a) In the matter of not releasing water for the second rotation to branch No. 2, ch. No 8/550 in Pandharpur Taluka from NRBC in 2014-2015 & not implementing the sections 12(6) & 12(6) (a) & (b) of the MWRRA Act 2005. | Download |
Shri. Shahaji Agatrao Nalavade, through Advocate S. M. Bhinge |
(1) (b) In the matter of releasing water from NRBC to the Phaltan, Malshiras, Pandharpur and Sangola Talukas
|
||||
Shri. Balasaheb Jivaba Kargal & Shri. Tukaram Shankar Jadhav. |
(2) In the matter of releasing water from Neera Left Bank Canal (NLBC) into Shetphal Tank
|
||||
17 | 5 | 2015 | Shri. Bharat Tukaram Bhalke, MLA | Releasing Water for Drinking Purpose to the Farmers and the Livestock from the Left and Right Bank Canals of Ujjani Reservoir | |
18 | 6 | 2015 | Shri. Siddeshwar Dadasaheb Varade | Releasing Water for Equitable Distribution in the Bhima sub-basin upto the Ujjani Reservoir filed by the Petitioner Shri. Bharat Tukaram Bhalke and Shri. Siddeshwar Dadasaheb Varade | |
19 | 7 | 2015 | Shri. Rajendra Shivaji Rao Nagawade, At Post Wangdari, Taluka Shrigonda, District – Ahmednagar & Shri. Shrinivas Baburao Ghadge, At Post Inamgaon, Taluka Shirur, District – Pune | Releasing Water for Equitable Distribution in the Bhima sub-basin upto the Ujjani Reservoir filed by the Petitioner Shri. Bharat Tukaram Bhalke and Shri. Siddeshwar Dadasaheb Varade | Download |
20 | 8 | 2015 | Shri Unmesh Patil, MLA | Releasing water from upstream dams in Girna sub-basin into Girna Reservoir | Download |
21 | 9 | 2015 | Shri. Bhaskarrao N Kharde, Ex-Chairman, Padamshree Dr. Vitthalrao Vikhe Patil Sahakari Sakhar Karkhana Limited & Others | Regarding GMIDC, Aurangabad Order dated 17/10/2015 about releasing water from upstream reservoirs into Jayakwadi Reservoir | Download |
22 | 10 | 2015 | Adv. Shivaji Maruti Anbhule | Releasing Water from Kukadi Project into Sina Dam | Download |
23 | 11 | 2015 | Shri. Ganpatrao Sahebrao Kakade | Releasing Water from Kukadi Project into Visapur Project | Download |
24 | 12 | 2015 | Shri. Suresh Namdev Gore & Others | Review of MWRRA’s order dated 26/10/2015 regarding releasing water from upstream dams of the Ujjani reservoir into Ujjani reservoir | Download |
25 | 13 | 2015 | Executive Director, Maharashtra Krishna Valley Development Corporation, Pune | Review of MWRRA’s Order dated 27/10/2015 regarding releasing water from Kukadi Complex into Ghod Dam | Download |
26 | 14 | 2015 | Adv. Mahadev Choudhary, Mumbai. | Case No. 14 of 2015 dated 26 November 2015 – before MWRRA in the matter of Releasing Water into Ujjani Reservoir from upstream dams as per MWRRA’s Order dated 26/10/2015 | Download |
27 | 15 | 2015 | Shri. Nandkumar Dagdu Mane (Patil) and others. | Water allocation of Dhom and Dhom-Balkavadi Project as per the Approved Detailed Project Report | Download |
28 | 16 | 2015 | Shri. Bharat Tukaram Bhalke, MLA, Pandharpur & Shri. Siddeshwar Dadasaheb Varade through Adv. Mahadev Choudhary | Releasing Water from upstream dams in the Upper Bhima sub-basin into Ujjani Reservoir as per Hon. High Court’s Bombay’s Order dated 03/12/2015 in WP 11426 /2015 & others | Download |
29 | 1 | 2016 | Shri. Keshavrao Ingole Patil, through Adv. Radhakrishna Ingole Patil, Nanded. | Releasing Water from Khadakpurna reservoir into Yeldari – Siddheshwar (Purna Project) reservoir as a part of equitable distribution | Download |
30 | 2 | 2016 | Shri. Rajendra Shivaji Rao Nagawade, Ahmednagar & Shri. Shrinivas Baburao Ghadge, Pune. | Releasing water from Kukadi Complex into the Ghod dam and carrying out equitable distribution for the Ghod sub-basin and deciding water quota for Ghod | Download |
31 | 3 | 2016 | Bhartiya Kisan Sangh and others (Dist. Pune) | Releasing water from Pavana reservoir on the basis of direction of the Bombay High Court in its Order dated February 12, 2016 in WP No. 1863 of 2013 | Download |
32 | 4 | 2016 | Shri. Nandkumar Dagdu Mane (Patil), Chairman, Shri. Chandragiri Kalva Pani Vapar Sahakari Seva Sanstha Ltd., Rahimatpur, Dist: Satara & others through Adv. Suresh Ramchandra Palande. | Water Allocation between Dhom and Dhom-Balkawadi Projects as per the approved Detailed Project Report | Download |
33 | 7 | 2016 | Shri S. R. Dethe, Dhondewadi and Shri J. D. Shinde, Bhalavani | To issue the Orders to Chief Executive Engineer, Executive Engineer, Superitending Engineer for distributing water in Kharif, Rabi, Hot Weather season from tail to head under Section 12(7) of the MWRRA Act | Download |
34 | 8 | 2016 | Ratan India Nashik Power Limited | Fixation of tariff for treated sewage water allocated to Rattan India Company for TPP, Sinnar | Download |
35 | 2 | 2017 | Mr. Pradeep G. Kale & others Taluka Indapur, District Pune, through Adv. Abhijit Deshmukh & Adv. P. H. Gaikwad (Patil). | Releasing water in the Bhima River from the Ujjani Reservoir | Download |
36 | 5 | 2017 | Trimurty Cooperative Water Supply Systems Ltd, Wanjale, Dist. Pune represented by Shri D. S. Dharpale and 13 Others | Proposal of Changing Planned Canal System of Gunjavani Project by Closed Pipeline System | Download |
37 | 6 | 2017 | Arvind Gulabrao Sondkar, Didghar, Tal-Bhor, Dist-Pune and 5 Others | A fixed quota of water for the K.T. weirs, drinking water schemes, LIS schemes which are already in existence along the Gunjavani river be provided in the project report and others | Download |
38 | 8 | 2017 | Adv. Ashish Jaiswal, Ramtek | Making Provision of Water for Irrigation Purpose by Curtailing the Use of Water from Pench Project Complex by the Nagpur Municipal Corporation | |
39 | 9 | 2017 | Shri N. R. Kakade, Tandulwadi and Shri B. K. Shinde, Madoli Shendechinch | Petition against the Order of PDRO regarding equitable distribution of water to the farmers of Bhalavani Branch No. 2 of Nira Right Bank Canal | Download |
40 | 1 | 2018 | Chief Engineer (O&M), Nashik Thermal Power Station, MAHAGENCO, Eklahare, Nashik Road | Fixation of tariff for contaminated water supplied to MAHAGENCO for Nashik Thermal Power Plant, Eklahare | Download |
41 | 3 | 2018 | Adv. Shivaji Anabhule & 2 others through Adv. Kailash Shevale | Releasing 1.2 TMC water from Kukadi Command into Sina Dam | Download |
42 | 7 | 2018 | Grampanchayat Pimpri Nirmal,Taluka Rahata, District Ahmednagar through Shri. Dnyandev Ghorpade | Grievance of the water reservation from Nilwande Dam to the Kopargaon Nagarpalika in the domestic water supply scheme for Shirdi Devsthan | Download |
43 | 13 | 2018 | Suo-Moto Petition | Relaxing water use norms by reserving water with 135 lpcd norm from Nilwande project to combined water supply scheme of Shri Saibaba Sansthan Vishwastha Vyavstha Shirdi, Shirdi Nagarpanchayat & Kopargaon City | Download |
44 | 10 | 2018 | Ashti- Jalashay Shethi- Pani Niyojan Samiti (Prop.) | In the matter of Appeal against the Order of PDRO dated 06/04/2018 about regular release of water from Ujjani Project to Ashti Dam | Download |
45 | 14 | 2018 | Pune Municipal Corporation | Appeal filed by Pune Municipal Corporation in the matter of the Judgment and Order of the Primary Dispute Resolution Officer dt. 23/10/2017 | Download |
46 | 11 | 2018 | Grampanchayat Kanadgaon,Taluka Rahuri, District Ahmednagar through Shri. Ravindra Kashinath Gagare | In the matter of grievance of the water reservation from Nilwande Dam to the Kopargaon Nagarpalika | Download |
47 | 6 | 2018 | Shri. Nandkumar Dagdu Mane (Patil), Chairman, Chandragiri Kalwa Pani Wapar Sahakari Seva Sanstha Ltd., Rahimatpur (Satara) & two others | Appeal against the Order of the PDRO dated May 25, 2018 as regards Water Allocation between Dhom & Dhom-Balkawadi Projects as per DPR | Download |
48 | 4 | 2019 | Dr. Sanjay Lakhe Patil, President Karmaveer Pratishthan, Jalna | Petition filed against the letter Order dated 01/11/2018 of Superintending Engineer & Administration, CADA, Nashik about not releasing water in Jayakwadi dam at Paithan from Upper Dam viz. Gangapur & Palkhed. | Download |
49 | 5 | 2019 | Shri. Shankar A. Nagre & Shri. S. U. Naik through Adv. Yashodeep Deshmukh | Petition filed by Shri. Shankar A. Nagre & Shri. S. U. Naik through Adv. Yashodeep Deshmukh in the matter of procedure of calculating district wise backlog in Irrigation Sector arising out of the Directives of the Hon’ble Governor | Download |
50 | 4 | 2019 | Suo – moto action on the representation preferred by the Petitioner – Govind Baba Water Users association, Nimbi Tal. Manglurpir Dist. Washim | Petition filed to release water through canal of Motsawanga Minor Irrigation Project, Motsawanga Taluka Manglurpir District Washim for rabbi season 2018-19 | Download |
51 | 12 & 15 | 2018 | Gram Panchayat Pimpri Nirmal, Tq. Rahata, Dist. Ahmednagar through Ex- Sarpanch, Shri. Gnyandev Nana Ghorpade and Miyasaheb Pani Vapar Sanstha Takalimiya through Shri. Gnyandev Nimse, Chairman | Petition arising out of Marathwada Water Grid Pipeline Scheme | Download |
52 | 3 | 2018 | 1) Adv. Shivaji Maruti Anabhule, R/o Ghumari, Tal. Karjat, Dist. Ahmednagar 2) Adv. Kailas Shankararao Shevale, R/o Pategaon Tal. Karjat, Dist. Ahmednagar 3) Shri. Milind Dattatray Bagal, R/o Takali Khandeshwari, Tal. Karjat, Dist. Ahmednagar | In the matter of releasing 1.2 TMC water from Kukdi Command into Sina Dam | Download |
53 | 6 | 2019 | 1. Shri. Balasaheb Damodar Murkhute, Member Vidhan Sabha Nevasa. 2. Nanasaheb Machindra Karade. 3. Dadasaheb Chandrabhan Wagh 4. Pratap Kundalik Chinge. 5. Mula Dharan Pani Wapar Sanstha Chairman, Vice Chairman, Director and members | In the matter of getting information about Jayakwadi dam’s water level | Download |
54 | 16 | 2018 | Cdr. Milind More (Retd.) Administrative Officer Sahyadri School | Seeking approval of water consumption at the rate of 135 liters per person per day at Sahyadri School | Download |
55 | 6 | 2018 | Appeal by Shri. Nandkumar Dagdu Mane (Patil), Chairman, Chandragiri Kalwa Pani Vapar Sahakari Seva Sanstha Ltd., Rahimatpur (Satara) & two others | (Issued in Compliance Proceeding & Review Applications arising out of Order No. 03/2019) In the matter of Water Allocation between Dhom & Dhom-Balkavadi Projects as per DPR | Download |
56 | 11 | 2019 | A Petition filed by Maharashtra State Power Generation Company Ltd. Nashik Thermal Power Station, Eklahare | In the matter arising out of Fixation of Tariff for supply of contaminated water for the applicant company for its Nashik Thermal Power Plant at Eklahare and claim of parity as per the rationale based on the Order this Authority in Case No. 12 of 2017 passed on October 13, 2017 | Download |
57 | 9 | 2019 | Khed Economic Infrastructure Private Ltd. | An Appeal filed by Khed Economic Infrastructure Private Limited (KEIPL) arising out of the order of PDRO dated April 25, 2019 regarding not granting permission to lift 18 MCM water directly from Chaskaman Reservoir instead of downstream of Chaskaman Dam | Download |
58 | 7 | 2017 | Shri Subhash Bhagavantrao Ghotkar R/o Morshi, Taluka, Morshi, Dist. Amravati | In the matter arising out of denial of permission to dig wells in the notified area | Download |
59 | 4 | 2019 | Motsawnga M.I.Tank, Motsawnga Tal.Mangrulpir Dist. Washim | In the matter of suo motu action representation Govind Baba Water Users association | Download |
60 | 2 | 2019 | Bhagwan Ganpatrao Tidke, R/o. Degaon, Tq. Ardhapur, Dst. Nanded. & 4 others | In the matter WRD’s Impugned Order dated 18/05/2018 about replanning of water allocation of Upper Painganga Project and not taking new project in Upper Painganga Project’s Catchmen | Download |
61 | 13 | 2019 | Ardhapur Municipal Council, Ardhapur, Dist- Nanded, Through Mr. Mirza Akhtarulla Baig & others | In the matter WRD’s Impugned Order dated 18/05/2018 about replanning of water allocation of Upper Painganga Project and not taking new project in Upper Painganga Project’s Catchmen | Download |
62 | 21 | 2018 | Prakash Motirao Wasmate. & 6 others | In the matter WRD’s Impugned Order dated 18/05/2018 about replanning of water allocation of Upper Painganga Project and not taking new project in Upper Painganga Project’s Catchment | Download |
63 | 1 | 2019 | 1. Shri. Madhav Ramrao Kadam R/o. Mudkhed, Tal. Mudkhed District Nanded 2. Mirza Akhararulla Beg Sadulla Beg R/o. Ardhapur Tal. Ardhapur District Nanded | In the matter WRD’s Impugned Order dated 18/05/2018 about replanning of water allocation of Upper Painganga Project and not taking new project in Upper Painganga Project’s Catchment | Download |
64 | 3 | 2021 | Gurudev Siddha Peeth, Ganeshpuri, Taluka Bhiwandi, District Thane | In the matter of re-categorizing and levying water charges applicable to township to a public charitable trust located in village Ganeshpuri. | Download |
65 | 4 | 2020 | Chief Engineer, Maharashtra State Power Generation Company Ltd. Nashik Thermal Power Station Eklahare, District- Nashik | A Petition filed by Chief Engineer, Nashik Thermal Power Station [NTPS] (MSPGCL) – Eklahare in the matter of review & removing difficulties arising out of Hon’ble Authority’s Order No. 03/2020 in Case No. 11 of 2019 | Download |
66 | 10 | 2019 | Dattakrupa Water Users Association, Nirnimgaon and others | Appeal filed against the SE, PIC, Pune’s Letter dated 26/06/2019 pursuant to the PDRO’s Order dated 18/06/2018 | Download |
67 | 1 | 2021 | Chief Engineer, Maharashtra State Power Generation Company ltd. Bhusawal Thermal Power Station Deepnagar, Dist- Jalgaon | In the matter of resolving disputes with WRD related to penal rates, water metering charges and delay charges. | Download |
68 | 5 | 2020 | Municipal Corporation of Greater Mumbai through its Dy. Hydrolic Engineer, Worli, Mumbai | In the matter of MWRRA Order No. 01/2018 dated 11/01/2018 whereby Bulk Water Rates for the Domestic Industrial & Agricultural Irrigation Use in the Maharashtra were revised & in the matter of Order dated 16/08/2018 passed by Executive Engineer, Bhatsa Dam Division, Bhatsanagar levying water charges at 2 times of the normal rate to the Petitioner w.e.f. March 2018. | Download |
69 | 4 | 2021 | Pioneer Distilleries Limited, Balapur, Taluka Dharmabad, District Nanded | In the matter of Appeal under section 22(3) of the MWRRA Act 2005, being aggrieved by the PDRO’s Order dated 27/04/2021 | Download |
70 | 14 | 2018 | Pune Municipal Corporation, Shivajinagar, Pune | In the matter of the Judgment and Order of the Primary Dispute Resolution Officer dt. 23/10/2017 | Download |
71 | 12 | 2019 | M/s Pernod Ricard India Pvt. Ltd | In the matter of revision of the water bill as per bifurcation of process water and as raw material. | Download |
72 | 22 | 2018 | Hindustan Coca-Cola Beverages Pvt. Ltd, Village Pirangut, Taluka Mulshi, District Pune | In the matter of impugned Order of Superintending Engineer, Pune Irrigation Circle, Pune dated 29/09/2018 | Download |
73 | 17 | 2019 | Rajendra Ghumare & 2 others | In the matter of Marathwada Water Grid sought to be established by State Government contrary to MWRRA Act | Download |
74 | 01 | 2022 | Shelke Beverages Pvt. Ltd. Kondhapuri, Taluka Shirur, District Pune | In The Matter of challenging the Primary Dispute Resolution Officer’s dated 25/03/2022 regarding levying water charges to water drawn from private well. | Download |
75 | 02 | 2020 | Dilip Vithal Kasar, R/o Village Nimaj, Taluka Sangamner, District Ahmednagar and others | In The Matter of Permission dated 26/11/2018 & Corrigendum dated 07/02/2019 by Godavari Marathwada Irrigation Development Corporation, Aurangabad and in the matter of fraud played by the Shirdi Sansthan, Shirdi Nagarpanchayat & Kopargaon Municipal Council | Download |
76 | 05 | 2021 | Siddheshwar Pani Vapar Sanstha through Shri. Maruti Sahebrao Bhapkar, Pimpalgaon Pisa, Taluka Shrigonda, District Ahmednagar | In The Matter of equitable distribution of water in the command of Kukadi Project as per Section 12(6) & 12(7) of MWRRA Act. | Download |
77 | 23 | 2028 | Late Rajabhau Tugar Sahakari Upsa Jalsinchin Sanstha Maryadit Shinde, Nashik through its Chairman Shri. Sanjay Pundalik Tugar | In the matter to stay the effect, operation and implementation of the order dated 23/10/2018 issued by the Godavari Marathwada Irrigation Development Corporation | Download |
78 | 3 | 2022 | Shri Arun Santoshrao Andhare | Challenging the Order of Sub Divisional Officer, Morshi, District Amravati dated 28/04/2021 regarding stopping the drilling of well and closing the excavated pit cum well | Download |
79 | 15 | 2019 | Rajendra Bhagwatrao Ghumare, and others | In the matter to review of this Authority’s Order dated 19/09/2014 and quash & set aside Government Resolution dated 12/09/2018 | Download |
80 | 16 | 2019 | Harishchandra Sahakari Pani Purwatha Sansthache Sahakari Fedration & Other | In the matter to review of this Authority’s Order dated 19/09/2014 and quash & set aside Government Resolution dated 12/09/2018 | Download |